The lab refurb is complete!
/It’s taken a while, but the lab refurbishment is now complete. Heriot-Watt Estates have installed a new ceiling and floor, have painted the walls, and have added storage and shelving. The School of Engineering and Physical Sciences have purchased a new optical table and have generously paid for the refurbishment works, so a big thank you to everyone who made this possible.